Home Renovation Services in Dubai
Home renovation in Dubai means renewing a villa, apartment or townhouse room by room or in one project: kitchens, bathrooms, floors, ceilings, joinery, painting and MEP, with the permits handled. In 2026 a full apartment renovation typically costs AED 35,000–280,000+ and a villa AED 80,000–1,500,000+, taking from a few weeks for a refresh to several months for a full villa overhaul.
✓ DED Licensed Renovation Contractor | ✓ Full Permit & NOC Management | ✓ Team in Dubai Since 2008

Explore our renovation services
5 specialist services, each delivered by our own in-house team across Dubai. Choose a service to see what's included, costs, timelines and FAQs.

Villa Renovation Dubai
Complete villa renovation in Dubai — structural works, MEP, kitchen, bathrooms & full permit management. Free site visit.

Apartment Renovation Dubai
Full apartment renovation in Dubai — fit-out, kitchen, bathroom, flooring & MEP works. Permit management included. Free site visit.

Kitchen Renovation Dubai
Custom kitchen renovation in Dubai — bespoke cabinetry, stone worktops, appliance integration & full permits. Free site visit.

Bathroom Renovation Dubai
Expert bathroom renovation in Dubai — waterproofing, premium tiling, sanitary ware & full permit management. Free site visit.

Interior Design Services Dubai
Bespoke interior design in Dubai — villas, apartments & offices. 3D visualisation, custom joinery & full design-build delivery.
Trusted Home Renovation Contractors in Dubai
Planning a home renovation in Dubai? At Vision Three Technical Services, we manage complete residential renovations across all property types — from full villa renovations in gated communities to apartment renovations in high-rise towers.
As an experienced home renovation company in Dubai, we approach every project with careful planning, honest communication, and craftsmanship that shows in the final result. Our project managers are on site daily. Our tradespeople are trained, licensed, and accountable for every stage of your renovation.
From obtaining your Dubai Municipality permit and developer NOC to final snagging and handover — Vision Three manages every phase of your home renovation in Dubai under one roof, so you deal with one team and one point of contact throughout.
Villas, Apartments & Townhouses
Complete home renovation services across every residential property type and community in Dubai.
Design, Permits & Build
In-house design, full permit management, and complete construction execution — one team, end to end.
Zero Authority Hassle
Dubai Municipality, developer NOCs, DEWA and Trakhees approvals — all handled by our team at no extra fee.
Home Renovation Services in Dubai We Provide
As a full-service home renovation contractor in Dubai, we deliver every trade under one management structure — no subcontracting to unknown teams, no split responsibility. Whether you need a complete interior fit-out in Dubai, a single-room upgrade, or a full property renovation in Dubai, Vision Three covers every scope, including approved wall removal and layout changes with structural engineering support and the Dubai Municipality permit.
Interior Design & 3D Visualisation
Space planning, mood boards, material specifications, and 3D renders for your Dubai home — approve every detail before a single wall is touched.
Kitchen Renovation in Dubai
Layout redesign, premium cabinetry, stone worktops, splashbacks, and appliance integration. Contemporary to classic — tailored to your brief.
Bathroom Renovation in Dubai
Waterproofing, large-format tiling, premium sanitary ware, vanity units, thermostatic showers, and wet area lighting — precision wet trade execution.
Flooring Installation in Dubai
Marble, porcelain, engineered wood, SPC vinyl, and herringbone parquet — with proper subfloor assessment, screeding, and levelling.
Gypsum Ceiling & Partition Dubai
False ceilings, feature coves, recessed lighting zones, gypsum partitions, and architectural plasterwork — crisp, clean, and climate-tested.
Painting Services in Dubai
Premium paints (Jotun, Dulux, Sherwin-Williams), wallpaper installation, microcement, textured finishes, and decorative wall treatments.
Joinery & Custom Carpentry Dubai
Built-in wardrobes, bespoke TV units, custom shelving, door replacements, and architectural joinery — all manufactured to your specification.
MEP Works & Electrical Services Dubai
Full rewiring, panel upgrades, plumbing relocation, drainage, AC replacement, and lighting design by DEWA-approved, DED-licensed technicians.
How Our Home Renovation Process Works in Dubai
Every home renovation project in Dubai follows a structured process designed to protect your budget, minimise disruption, and deliver exactly what was agreed — without surprises.
- 01
Free Site Visit & Consultation
We visit your Dubai property, assess the scope, and listen to your requirements. No charge, no obligation.
- 02
Design, 3D & Itemised Quotation
Drawings, 3D visuals, materials, and a fully itemised Bill of Quantities — no lump sums.
- 03
Dubai Permits & NOC Management
DM permits, community NOCs (Emaar, Nakheel, DAMAC), and DEWA approvals — fully managed.
- 04
On-Site Execution & Management
Dedicated project manager on site daily, regular progress updates, and strict programme adherence.
- 05
Snagging, Handover & Warranty
Full snagging inspection, defect resolution, workmanship warranty, and keys-in-hand handover.
Home Renovation Cost in Dubai — What to Budget
In 2026 a home renovation in Dubai typically costs AED 35,000 for a studio up to AED 280,000+ for a 3-bedroom apartment, AED 100,000–350,000 for a townhouse, and AED 80,000–1,500,000+ for a villa, from a cosmetic refresh at the lower end to a full renovation with new kitchen, bathrooms, ceilings, joinery and MEP at the top. Prices exclude VAT.
Indicative 2026 Dubai pricesFixed, itemised written quote after a free site visit
Apartment renovation
Studio to 3-bedroom, from a cosmetic refresh to a full renovation of every room.
Get this quoteTownhouse renovation
Kitchen, bathrooms, floors, ceilings and joinery across two or three floors, with community approvals.
Get this quoteVilla renovation
From a cosmetic refresh to a full structural overhaul with new MEP and premium finishes.
Get this quoteVision Three provides fully itemised, line-by-line quotations for every home renovation project in Dubai. You will always know exactly what each element costs before you commit — no lump sums, no hidden charges. Permit fees, authority deposits, and community NOC costs are all stated separately and passed through at cost — no markup.
For the full cost and timeline by apartment size and villa scope, see our apartment renovation and villa renovation pages. For a planning method, read our guide to budget planning for a Dubai renovation.
Room-by-Room Renovation Budget in Dubai
The main parts of a home renovation and what each typically costs in Dubai in 2026, supplied and installed. Add the parts your home needs to build a first budget.
| Part of the renovation | Typical 2026 cost (AED) |
|---|---|
| Kitchen renovation | 15,000–260,000+ per kitchen |
| Bathroom renovation | 8,000–130,000+ per bathroom |
| Floor and wall tiling, supplied and fixed | 150–500 per m² (basic to mid-range porcelain) |
| Gypsum false ceiling | 70–110 per m² plain, 90–150 per m² with a cove |
| Built-in wardrobes | 800–1,800 per linear metre (melamine), 1,500–3,000 (lacquer) |
| Interior painting | From 450 per room, from 1,200 per apartment |
| New light point or socket | 60–500 each |
| Full villa MEP during a renovation | 45,000–250,000+ |
Each line has its own page with options and prices: kitchen renovation, bathroom renovation, tile fixing, false ceilings, custom wardrobes, interior painting and MEP works.
Add a contingency. Older Dubai homes often hide failed waterproofing, corroded pipes or old wiring behind the finishes. Keep 10–15% of the budget aside for what only appears once the old finishes come off.
Keep wet areas where they are. Moving a kitchen or bathroom means new water, drainage and electrical routes, and is usually the biggest single cost difference between two similar renovations.
Villa & Apartment Renovation in Dubai — By Property Type
Villas, apartments, and townhouses have very different renovation requirements, approval processes, and timelines. We bring specific expertise and community knowledge to each.
Villa Renovation in Dubai
Villa renovation in Dubai requires a different skill set from apartment work. The scale is larger, MEP systems are self-contained, community design rules are strict, and structural changes need careful engineering consideration. Vision Three has extensive experience renovating villas across every major gated community in Dubai.
We manage villa renovation projects across Arabian Ranches 1, 2 & 3, The Springs, The Meadows, The Lakes, Jumeirah Park, Jumeirah Golf Estates, Victory Heights, Mudon, The Villa, Al Barari, Dubai Hills Estate, DAMAC Hills 1 & 2, Tilal Al Ghaf, The Oasis, Emirates Hills, and all surrounding villa communities.
Apartment Renovation in Dubai
Apartment renovation in Dubai demands precision and compliance. You are working within a defined footprint, above neighbouring residents, with building management rules governing noise hours, waste disposal, material deliveries, and approved contractor lists. Vision Three holds the necessary licences to operate in all major Dubai buildings.
We are approved to operate in developments managed by Emaar, Nakheel, Dubai Holding, and independent management companies across Dubai Marina, Downtown Dubai, Business Bay, Palm Jumeirah, JBR, Emaar Beachfront, Dubai Creek Harbour, Bluewaters Island, and City Walk.
Townhouse & Duplex Renovation in Dubai
Townhouse renovation in Dubai sits between villa and apartment in complexity — larger than apartments, subject to both community NOC and building management rules simultaneously. Vision Three manages both approval tracks in parallel, significantly reducing your total project timeline.
We renovate townhouses across JVC, Al Furjan, Mudon, Town Square, Remraam, The Valley, Motor City, Green Community, and all major Dubai townhouse communities — with established NOC relationships in each.
Villa Renovation Cost in Dubai
AED 80,000 to AED 1,500,000+, depending on size, scope and finish level. See our villa renovation page for the full breakdown.
Apartment Renovation Cost in Dubai
AED 35,000 for a studio to AED 280,000+ for a 3-bedroom, depending on size, scope and finish level. See our apartment renovation page for the full breakdown.
Parallel NOC Submissions
We submit the community NOC and Dubai Municipality applications at the same time, saving you weeks compared with contractors who submit them one after the other.
COSMETIC VILLA REFRESH
Paint, flooring, fixtures, lighting
MID-RANGE VILLA RENOVATION
Kitchen, bathrooms, ceilings, joinery
FULL VILLA OVERHAUL
Structural + full MEP + all finishes
SINGLE ROOM
Bathroom or bedroom refresh
KITCHEN OR BATHROOM
Complete wet area renovation
FULL APARTMENT RENOVATION
Complete renovation all rooms
TOWNHOUSE RENOVATION COST
TYPICAL TIMELINE
incl. approvals
Why Choose Vision Three for Home Renovation in Dubai
Choosing the right home renovation company in Dubai is the most important decision in your project. Here is what makes Vision Three different from most renovation contractors in Dubai.
Itemised Renovation Quotes
No lump-sum renovation quotes. Every cost is broken down line by line so you understand exactly what your Dubai home renovation will cost — and can adjust scope with confidence.
On-Site Project Management
Your dedicated project manager is present on site every day — not managing your renovation from an office. Every trade is coordinated, sequenced, and accountable throughout.
Full Dubai Approvals Managed
DM renovation permits, developer NOCs, DEWA notifications, Trakhees and DDA approvals — we handle every government track. You never deal with any authority yourself.
Remote Renovation Management
Many of our clients renovate their Dubai property from overseas. Weekly written reports, photo and video updates, and WhatsApp access keep you fully informed throughout.
The Right Order of Trades in a Full Home Renovation
Most renovation delays and repairs come from trades working in the wrong order. This is the sequence we follow in every Dubai home.
| Stage | What happens | Why it comes here |
|---|---|---|
| 1. Protection and strip-out | Floors, lifts and corridors protected; old kitchen, bathrooms, ceilings and finishes removed | Shows what is behind the walls before anything new is ordered |
| 2. Structure and layout | Approved wall removal, new partitions, openings and blocking for heavy items | Every later trade depends on the final walls |
| 3. First-fix MEP | New pipes, drainage, cables, AC ducts and points, tested before closing | Must be in the walls and ceilings before they are closed |
| 4. Waterproofing and screeds | Two-layer bathroom waterproofing, flood test, levelling screeds | Tiles and floors need a sound, dry, level base |
| 5. Ceilings and walls | Gypsum ceilings, plastering, first coats of paint | Dusty, wet work done before fine finishes arrive |
| 6. Tiling and flooring | Wall and floor tiles, marble, wood or SPC floors | Joinery and doors are measured to the finished floor |
| 7. Joinery and kitchen | Kitchen, wardrobes, vanities, doors, worktops and splashbacks | Fitted on finished floors and walls, then protected |
| 8. Second fix and final paint | Lights, sockets, sanitary ware, appliances, final paint coat | Last, so nothing is damaged by earlier trades |
| 9. Snagging and handover | Every room checked, defects fixed, deep clean, keys and warranties handed over | You receive a finished home, not a list of fixes |
Because we run every trade with our own team, each stage starts as soon as the one before it is signed off, without waiting for another contractor to arrive. That is how a full apartment renovation can finish in 6–12 weeks.
Renovation, Fit-Out or Refresh — Which Do You Need?
Three words people use for very different projects. The right one depends on what is wrong with the home today.
| Feature | Cosmetic refresh | Full renovation | Fit-out |
|---|---|---|---|
| What it means | New paint, floors, fixtures and lighting; layout and services stay | New kitchen, bathrooms, ceilings, joinery and MEP; layout can change | Finishing an empty or shell unit to a usable home |
| Typical apartment cost | From AED 35,000 | AED 80,000–280,000+ | Quoted per unit |
| Typical time | 2–6 weeks | 6–12 weeks (apartment), 10 weeks to 9 months (villa) | 6–16 weeks |
| Permits | Usually a building or community notice only | NOC plus Dubai Municipality or Trakhees for MEP or layout changes | NOC, permits and DEWA connection |
| Best for | Rentals between tenants, a quick update before selling | Homes you will live in for years, or older properties | New handovers and investor units |
Not sure which you need? Send a few photos on WhatsApp. We will tell you honestly whether a refresh is enough, or whether the kitchen, bathrooms or services need a full renovation now to avoid paying twice later.
Renovating to Sell or Rent in Dubai
A renovation for your own home and a renovation for a sale or tenancy should not be planned the same way.
Renovating Before Selling
Buyers judge kitchens, bathrooms and floors first. A neutral, well-finished refresh of these, with fresh paint and modern lighting, usually does more for the sale than a full redesign.
Renovating to Rent
Tenants and agents look for durable, easy-clean finishes. Porcelain floors, quality paint and simple modern fittings keep the unit rentable for years with little maintenance.
Renovating to Live In
Here the layout, storage, lighting and comfort matter most. This is where full renovations, custom joinery and layout changes pay back every day.
What adds the most value? In most Dubai homes it is the kitchen and bathrooms, then flooring, lighting and built-in storage. Fixing anything that looks tired or dated in these areas changes how a home feels, photographs and sells. Very personal design choices add little value for a buyer, so keep them for a home you plan to stay in.
Phasing. If the budget does not cover everything now, renovate in an order that never undoes earlier work: services and wet areas first, then floors and ceilings, then joinery and decoration.
6 Home Renovation Mistakes We See in Dubai
Most renovations we are asked to repair went wrong in one of these ways.
Starting without the NOC or permit. Building management can stop the work, and unapproved changes can have to be reversed before a sale.
Choosing the lowest lump-sum quote. A low quote often leaves out waterproofing, MEP, making good or removal. Compare itemised quotes line by line.
Covering old pipes and wiring. New finishes over failed waterproofing or corroded pipes have to come out again. Check and replace services while the walls are open.
Ordering joinery before the floor is finished. Kitchens, wardrobes and doors measured on an unfinished floor do not fit.
No contingency. Older properties almost always hide something. A 10–15% contingency keeps the project on track.
No written warranty. Ask what is covered, for how long, and who you call after handover.
Recent Project: Al Furjan West Villa Kitchen
One of our recent renovations, with before and after photos and a video tour.

Full kitchen renovation in a villa, finished in four weeks. The old aluminium-framed cabinets and black granite worktops were replaced with floor-to-ceiling handleless cabinets made in our own workshop, a marble-look waterfall island, full-height splashback and LED lighting.
Dubai Renovation Permits & NOC — Everything Managed for You
Dubai has a clearly structured approvals process for home renovation works. Understanding it upfront prevents costly delays. Never start renovation work without the correct permits in place — unauthorised renovation in Dubai can result in stop-work notices, fines, and forced demolition of completed work.
As your home renovation contractor in Dubai, we manage every renovation permit in Dubai — the entire approvals track on your behalf — from initial NOC application through to permit issuance and final completion certificate.
You will not need to visit any government authority or chase any department. We handle it completely.
Dubai Municipality (DM) Permit
Required for structural changes and MEP modifications. Minor Works: 1–2 weeks. Major Works: 3–6 weeks. Permit fees AED 500–15,000 depending on scope.
Developer NOC (Community)
Required in Emaar, Nakheel, DAMAC, Dubai Holding, and Meraas communities before any renovation starts. Minor works NOC: 1–2 weeks. Structural NOC: 3–5 weeks.
DEWA Approval
Required for any electrical load modification — new AC systems, panel upgrades, or EV charging installation. All work carried out by DEWA-approved electricians.
Trakhees & DDA Approvals
Applies to properties in free zone jurisdictions — JLT, Dubai Design District, JAFZA, and select freehold zones. Separate submission system from Dubai Municipality.
Home Renovation Services Across All Dubai Communities
Our home renovation teams cover the entire Dubai emirate, with established NOC relationships across every major developer community for faster approvals.
- 61communities covered
- 3service zones
- Freesite visit before we quote
- Ownin-house tradespeople
Villa communities
- Emirates Hills
- Palm Jumeirah
- Dubai Hills Estate
- Al Barari
- Arabian Ranches
- Arabian Ranches 2 & 3
- Jumeirah Golf Estates
- District One
- Tilal Al Ghaf
- DAMAC Hills
- DAMAC Hills 2
- The Villa
- Mudon
- Villanova
- The Springs
- The Meadows
- The Lakes
- Emaar South
Waterfront & central
- Dubai Marina
- Jumeirah Lakes Towers (JLT)
- Downtown Dubai
- Business Bay
- Emaar Beachfront
- Bluewaters Island
- Dubai Creek Harbour
- City Walk
- Sobha Hartland
- Meydan
- Nad Al Sheba
- MBR City
- JBR
- Pearl Jumeirah
- Dubai Harbour
- The Greens & The Views
- Al Jaddaf
All neighbourhoods
- Jumeirah 1, 2 & 3
- Al Wasl
- Umm Suqeim
- Al Safa
- Al Barsha
- Barsha Heights
- Jumeirah Park
- Jumeirah Islands
- JVC
- JVT
- Al Furjan
- Discovery Gardens
- Victory Heights
- Motor City
- Dubai Sports City
- Town Square
- Remraam
- Serena
- Mirdif
- Al Khawaneej
- The Sustainable City
- Dubai South
- The Valley
- The Oasis
- Dubai Islands
- Green Community
Most requested communities. Don’t see yours? We cover every area of the Dubai emirate — message us on WhatsApp and we will confirm.
Home Renovation Dubai — Frequently Asked Questions
15 questions answered
Send it with a photo on WhatsApp and we will answer it, usually within one working day.
Do I need a permit for home renovation in Dubai?
It depends on scope. Cosmetic changes — repainting walls, replacing light fittings, changing furniture — typically do not require a Dubai Municipality permit. However, structural changes (removing walls), MEP modifications (moving plumbing, upgrading electrical panels, adding AC units), and significant layout alterations all require DM approval before work starts. Properties in gated communities or developer-managed buildings also need a community NOC. Vision Three assesses your full scope and manages all required permits and approvals.
How much does home renovation cost in Dubai?
In 2026 a home renovation in Dubai typically costs AED 35,000 for a studio up to AED 280,000+ for a 3-bedroom apartment, AED 100,000–350,000 for a townhouse, and AED 80,000–1,500,000+ for a villa, from a cosmetic refresh to a full overhaul with new MEP and premium finishes. A kitchen costs AED 15,000–260,000+ and a bathroom AED 8,000–130,000+. Vision Three provides a fully itemised quotation so you know exactly what you are paying for.
How long does a full home renovation take in Dubai?
Timelines depend on property type and scope. A cosmetic apartment refresh takes 2–4 weeks. A full apartment renovation typically takes 6–12 weeks. Villa renovations range from 4 weeks for a cosmetic update to 4–9 months for a full structural overhaul — with Dubai Municipality permit approval adding to the front end. Vision Three provides a detailed project programme with every confirmed project so you can plan accordingly.
Do I need to vacate my home during renovation in Dubai?
For full villa overhauls or major structural works, vacating is strongly recommended for safety and to accelerate progress. For partial renovations — a kitchen and bathroom upgrade in an occupied apartment, for example — it is often possible to remain if works are sequenced room by room. We will give you an honest assessment based on your specific scope and property before work begins.
Can Vision Three handle both interior design and the renovation?
Yes. Our in-house design team works with you from initial concept through to material specification and construction drawings. We produce 3D visualisations so you can review and approve the design before any physical work begins. Having design and build under one roof eliminates miscommunication, protects your budget, and ensures what gets built matches what was designed.
Do you manage Dubai Municipality renovation permits and community NOCs?
Yes — this is a core part of our service. Vision Three manages all DM renovation permit applications, community NOC submissions (Emaar, Nakheel, DAMAC, Dubai Holding, and all others), DEWA notifications, and Trakhees or DDA approvals where applicable. Government and authority fees are passed through at cost with no markup. You receive copies of all approvals for your records.
Can you manage my Dubai home renovation if I am based overseas?
Yes. A significant portion of our clients are overseas investors and expatriates who renovate their Dubai properties remotely. We manage the complete project — procurement, approvals, daily site supervision, and quality control — with weekly written reports, regular photo and video updates, and WhatsApp access throughout. Your physical presence in Dubai is not required.
What warranty does Vision Three provide on renovation work?
Vision Three provides a workmanship warranty on all completed renovation projects, with specific warranty periods by trade detailed in your contract. We also offer an annual maintenance contract to protect your renovation long term. If any post-handover issue arises within the warranty period, we respond promptly and resolve it at no additional cost.
What is the difference between a fit-out and a renovation in Dubai?
A fit-out typically refers to building out an empty or shell space — furnishing and finishing it to a liveable or usable standard. A renovation refers to upgrading, modifying, or transforming an existing space that is already finished. Vision Three handles both — residential fit-out in new properties and full renovation of existing homes across Dubai.
Which areas in Dubai do you provide home renovation services?
Vision Three provides home renovation services across the entire Dubai emirate — all villa communities including Emirates Hills, Arabian Ranches, Dubai Hills Estate, Jumeirah Golf Estates, Al Barari, DAMAC Hills, and Tilal Al Ghaf, as well as all major apartment and townhouse communities including Palm Jumeirah, Dubai Marina, Downtown Dubai, Business Bay, JVC, JVT, Al Barsha, Jumeirah, and all surrounding areas.
Should I renovate my Dubai property before selling or renting it?
Often, yes, but keep it focused. A neutral refresh of the kitchen, bathrooms, floors, paint and lighting usually helps a sale or tenancy most. A full redesign rarely pays back for a buyer or tenant. We can price both options so you can compare the cost with the likely return.
What part of a home renovation adds the most value?
In most Dubai homes the kitchen and bathrooms add the most value, followed by flooring, lighting and built-in storage. These are what buyers and tenants notice first. Very personal design choices add little resale value, so keep them for a home you plan to live in.
Can I renovate my home in phases?
Yes. Phase it in an order that never undoes earlier work - services and wet areas first, then floors and ceilings, then joinery and decoration. Each phase gets its own itemised quote and timeline, and we plan the permits so later phases are covered too.
How much contingency should I keep for a renovation in Dubai?
Keep about 10–15% of the budget aside, more for older properties. Failed waterproofing, corroded pipes and old wiring often only appear when the finishes come off. We point out the likely risks at the site visit so the contingency is planned, not a surprise.
In what order should renovation work be done?
Strip-out first, then structural and layout changes, first-fix plumbing, electrical and AC, waterproofing and screeds, ceilings and plaster, tiling and flooring, then kitchens, wardrobes and doors, and finally second-fix fittings, final paint and snagging. Working in this order avoids damage and rework.
Start Your Home Renovation in Dubai Today
Whether you are planning a full villa renovation in Dubai, a complete apartment renovation, or a focused kitchen or bathroom upgrade — the first step is a free site visit. We assess your property, understand your objectives, and provide an honest, itemised quote with no pressure and no hidden costs.